Saturday, December 7, 2013

Education-Mall!

Many older malls are still struggling and continue to take on more and more non-typical "mall" tenants.

This Minnesota mall has been migrating from retail to educational uses for about a decade.

Growing programs continue to grow and consume even more adjacent vacant space. This round didn't even require additional toilets or other expensive infrastructure or upgrades; because we can consider it an expansion of the current educational uses. (Save tens of thousands in capital costs)

Own an empty building or mall? Consider seeking non-traditional, non-retail, tenants.

We can help overcome any program, zoning or building code issues, as well as layout spaces in a manner that will benefit the tenant (income) and landlord (expenses) long-term.




Code Plan

Project: Coon Rapids - Transitions Plus Program, by my good friend's firm: Mike Kraft Architects.)


- Posted using BlogPress from my iPhone

Wednesday, November 27, 2013

British Basement....final design documents

The design for the British Basement is complete after some priority shifts, input from others and a decision to take over two adjacent nooks and cranny's!

Client needed to create a second kitchen(ette) to help host up to 100 church youth at their home from time to time.

Creating a longer, skinnier galley kitchen which stole about three feet from the existing mechanical room was the trick.

Features dark stained, raised wood panel cabinets, pilasters, wainscot and trim, along with a coffered ceiling and slate floor. This intense zone gives way to a simpler carpet and paint family room on one side and a family photo gallery, curved glass curio, on the other.

Facing the kitchenette is a custom reading alcove surrounded by floor to ceiling shelves for an antique book collection. This alcove was made possible by the re-structuring of one leg of the staircase landing and relocating the door to the under stair storage, now dedicated to AV components and general storage.

The design intentionally incorporates the look and feel of a British Pub based on about 20 different photographs selected by the client.

The layout is extremely functional, seating 10 around the paired peninsulas, with room to stand and walk behind each stool. There are three distinct workstations, and plenty of storage in the cabinets and the adjacent mechanical and storage rooms.

Enjoy!






































- Posted using BlogPress from my iPhone

Friday, November 8, 2013

2D or not 2D, that is the question.

2D or not 2D....that is the question.

I think in 3D, and work out my ideas in 2D plans, sections and elevations, but my clients better understand the concept if a 3D visual is available.

Here are some 2D and 3D studies, which do you find easier to understand?

2D plan for second living quarters addition:


2D Plan of special education tenant improvement:



2D Plan of A British basement library and entertainment kitchenette:



2D Plan and Elevation of an elevated stamped concrete and steel deck designed to entertain youth groups for 50-100:



3D sketches for three roof forms for a hotel addition from more to less expensive....B was selected by the client:


3D study of a fellowship doubling for my Lutheran church friends:


These are all works I created for various clients over this past week!

How can I help you make your dream project come alive?

Test




- Posted using BlogPress from my iPhone

Location:Test

Wednesday, November 6, 2013

K-12 projects...like a comfortable sweater!

It has been 5 years since I have had a chance to work on a Minnesota public school project. 

It feels great to have this chance to utilize my gifts on a couple of basic school projects. These two projects will help thousands of children, in this case some middle school and special needs kids, for decades!

Warm fuzzy feelings...even doing benign wall sections.




Wednesday, October 30, 2013

LSF Design - Week 1

Blog post:

This first week of transitioning to FT has been a lot of scrambling, organizing, sorting, consolidating, and endless technology coordination.

With my Dad getting ill and passing away last week, I haven't had much focus either.

Luckily I did find some time to get a little work done:

1) Three room hotel addition including fitness center, coin laundry and storage remodel: 

2) Special education tenant improvement for a friends' firm...missed the school work:

Tomorrow thru Next week:  back to my basement remodel design, master suite addition, distillery concept, and RLC renderings. 

Teaming with two other firms, I have plenty of room for more work soon....bring it on!


- Posted by Larry Fredlund using BlogPress from my iPhone


Thursday, September 12, 2013

MAC: Make Then Detached

And they were detached.

Working with limited description of the problem to be solved makes the solution take a bit longer to get to.

I had detached Hanger 1 for the office and Hanger 2, but now I learned all three must be detached.

OK....I will label them as such!

He he!






- Posted by Larry Fredlund using BlogPress from my iPhone