Saturday, March 4, 2017

Redfield Garage and Pottery Studio

Framed, enclosed and slab being finished.  Roof lines were a puzzle but match existing. All the trim and finishing top notch.  Great job Lon and LJ Level Construction.

Garage required a side yard setback variance which permitted the entire from of the house to retain it's view of the front yard.  Notice the prow roofline to match existing.

Lots going on to make this as simple as possible.

Finishing a part of the pottery studio expansion.   Good afternoon light pouring in already.   Sonotube will provide diffuse light from above too.