Friday, February 17, 2012

Another NHCC sneak peek

A partial preview of the renderings of the schematic design for future new hope community church building on Skogman Lake.

Programming and Budgeting are always fun, but designing and sharing the team's design are more fun. The best of all will be watching the church grow into it's own walking down this meandering path of creating permanent memories and foundations in Isanti County, and yes, Bill, Beyond!!!

Want to see more.....Attend New Hope services the last two Sunday's in Feb. And first Sunday in March.









Design by LSF Design, Larry Fredlund
Renderings by ShoeGnome, Jared Banks and "secret" David.



- Posted using BlogPress from my iPad

Location:Cambridge, MN

Monday, February 13, 2012

Sneaky Peek....NHCC worship center

So.....the Ides of February, 2012 will bring some new visuals for the new building out on Skogman Lake. Here are my notes to the computer modeler....from his very preliminary mockups, of my original design for the site and building. Attend church 2/18....2/25.....3/4....to unveil even more glimpses into new hopes future out on the lake.




SITE PLAN


FRONT/WEST ELEVATION


INTERIOR OF ENTRANCE/LOBBY

- Posted using BlogPress from my iPad

Location:Cambridge, MN

Tuesday, February 7, 2012

NHCC building on the land update

Been a while since I updated on this project....a series of design plans, elevations and perspectives I've done over the last year or so. I have two experts creating some surprises......coming in the next few weeks.....you'll have to wait till you see them at New Hope on a coming Sunday!




Phase I - ballfields funded by others, land by New Hope.




Final sketch of preliminary floor plan...



The lobby and lakeside patio.




Fundraising Sketches.

- Posted using BlogPress from my iPad

Two Bedroom Addition

New Client in Blaine:
Limited budget, limited space, need another bedroom and a larger space to homeschool their six kids.
Two schemes...."A" links the existing study area and new study area with a new stair.








"B" splits the existing bathroom in to two rooms to accommodate more kids, and a kids hall to link all the bedrooms and study area bonus room.








Some very preliminary exterior sketches just to see if something is workable....there is hope, but these don't quite jive yet. (not shared....maybe after some fine tuning).
All this in 2.5 hours and an initial free meeting. The client had plans, and a pretty good idea of what they needed...didn't like their contractor's solution which added footings, foundations and was about double their budget.
Need ideas for your remodel....let's go,
- Posted using BlogPress from my iPad

Location:Blaine, Minnesota

Saturday, August 13, 2011

Code analysis and design...approach matters.

There are times where common sense doesn't seem to align with the building codes. The codes and their enforcers exist for one reason...to protect lives. If you are trying to expand or change your business, you may run into a series of limitations imposed by the codes. With a little creative thinking, a clear presentation, and by working within the intention and letter of the building codes, you CAN do what you want. Below is the approved plan and calculations for a print shop expansion into an existing auto dealership parts mezzanine. With some minor alterations to the original plan....a building permit can now be pulled. Call me in sooner than later....asking permission first works better than apologizing later when it comes to building codes and permitting. They CAN make you rip out the work and restart....now THAT'S expensive.



Even though 22 occupants doesn't mandate two exits, common path of travel on the second floor does!


Upper Level Plan.....two exits separated a minimum distance eliminates the need for sprinklers. Saves at least $10,000.



Partial First floor plan...creative two hour configuration maintains the circulation to the existing two doors below serving the customer lounge and parts room.

- Posted using BlogPress from my iPad

Location:Cambridge, MN

Saturday, June 25, 2011

Allen Studio and Workshop

A few very preliminary doodles....looking to create an even more picturesque setting at their current home. VOTE FOR 1, 2 or 3....comments welcome.


1...existing garage to remain for now...replaced in phase two. Gable roof with a pair of matching shed dormers. Wrap around roof deck too.




2...four square with a fireplace and wrap around stair to above...alley/garbage access.




3... Ignore the oval on the plan, a 1 story painting studio turret, and two story workshop/storage behind. Add some board trim to the existing garage.



- Posted using BlogPress from my iPad

Location:Cambridge, MN

Saturday, May 21, 2011

Ashworth Kitchen Remodel Plans

$150 bucks to meet and come-up with four kitchen remodel schemes.
VOTE for your favorite, and comments welcome!
DESIGN MATTERS....